EasyManuals Logo
Home>Oracle>Controller>Acme Packet 6350

Oracle Acme Packet 6350 User Manual

Default Icon
131 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #64 background imageLoading...
Page #64 background image
Console Port
2. Insert the RJ45 connector on the end of the console cable into the console port
labeled Console.
Connected Console Port Cable
3. Lead the console cable neatly away from the rear panel toward a terminal server
or other component where this serial connection terminates.
Alarm Port Cabling
The alarm port indicates electrically when an alarm has been generated on the Acme
Packet 6300/6350. The alarm port contains leads for three circuits, each of which
closes to signify a corresponding alarm.
Cabling Procedure
To connect the alarm port cable to the NIU alarm port:
1. Locate the alarm contact cable you plan to connect to the Acme Packet 6300/6350
System.
2. Insert the RJ45 connector on the end of the alarm port cable into the alarm port
labeled Alarm. The release tab on the RJ45 jack clicks into place when you insert
it properly.
Chapter 4
Cabling the Acme Packet 6300/6350 System
4-27

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Oracle Acme Packet 6350 and is the answer not in the manual?

Oracle Acme Packet 6350 Specifications

General IconGeneral
BrandOracle
ModelAcme Packet 6350
CategoryController
LanguageEnglish

Related product manuals