EasyManua.ls Logo

Oracle storagetek sl150

Oracle storagetek sl150
266 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Test Unit Ready
240 SL150 Interface Reference Manual Julyl 2017
Test Unit Ready
The Test Unit Ready command (00h) allows the initiator to determine if the library is
powered-on and ready to accept additional commands. This is not a request for a
library self-test.
The Test Unit Ready command returns a Good status if the library is ready to accept
additional commands. This command also returns a Check Condition if the library is
not ready or if there are pending Unit Attentions.
TABLE 4-135 Test Unit Ready Command
Byte
Bit
76543210
0 Operation Code (00h)
1 Ignored Reserved (00h)
2 Reserved (00h)
3 Reserved (00h)
4 Reserved (00h)
5 Control Byte (00h)

Table of Contents

Other manuals for Oracle storagetek sl150

Related product manuals