w
()
z
<
z
w
1-
z
;;:
:E
3-4-6.
REEL
MOTOR
UNIT
MAINTENANCE
PROCEDURES
A. Replacement
of
the
Reel
Unit
1.
Remove 6 screws (L) and carefully I
ift
the
DO
Reel
Unit.
2.
Disconnect a connector.
Screws
(L)
DD
Reel
Connector
Figure M15
3.
The
Reel
Motor
Unit can
be
re-installed
by
reversing
the
rem ova I procedure.
*Note: When
assembling the
DO
Reel
Motor
Unit, slide
the
Main Rod
to
far
left
side
by
rotating
a Center Gear.
...
Cut
Washers
Figure M 16
3-8
3-4-7.
MAIN
BRAKE
(S),(T)
UNIT
MAINTENANCE
PROCEDURES
A.
Replacement
of
the
Main
Brake (S},(T)
Unit
1.
Remove the
Reel
Unit. (Refer
to
Reel
Motor
Maintenance Procedures.)
2.
Remove a Retaining Ring.
3.
Remove
the
Main Brake (S),(T) with a spring.
Suplly
Reel
Take-up Reel
Brake Solenoid Brake Spring
Figure M17
4.
The new Main Brake (S), (T) Unit can
be
reinstalled by reversing
the
removal procedure.
*Note: When
assembling
the
DO
Reel
Motor
Unit, slide
the
Main Rod
to
far
left side
by
rotating
a Center Gear. (Figure M16)
3-4-8.
LOADING
MOTOR
UNIT
MAINTENANCE
PROCEDURES
A.
Replacement
of
the Loading
Motor
Unit
1.
Remove the Loading Belt.
2.
Remove the Loading
Motor
Pulley.
3.
Disconnect a connector.
4.
Unscrew 2 screws (M) and remove
the
Loading
Motor
Unit.
Screw
{M)
Loading
Motor
Unit
Loading
Motor
Pulley
Ja-+--1
1
Connector
Motor
Base
C.
B.A.
Figure M 18
5.
The Loading
Motor
Unit can
be
reinstalled
by
reversing the rem ova I procedure.