EasyManua.ls Logo

Panasonic AG-7350 Series - Assembly Procedures of Center Gear; Assembly Procedures of Loading Gear (T), Loading Gear (S) and Sector Gear; Assembly Procedures of Main Lever and Cam Follower Arm Unit

Panasonic AG-7350 Series
214 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-4-5. ASSEMBLY PROCEDURES OF
CENTER GEAR
1.
Softly Install the Center Gear onto the Retainer Gear so
that the two holes
in
the Center Gear align with the holes
on
the Retainer
Gear,
then install the cut washer
as
shown
in
Figure
M51.
Capstan
Motor
Center Gear
~
1 Through Hole
Retainer
Gear-=·=
Ring
Gear~~
Chassis
·
Figure
M51
Center Gear
Loading Cam
Gear
4-4-6. ASSEMBLY PROCEDURES OF
MAIN
LEVER AND CAM FOLLOWER
ARM UNIT
1 . Install the
Main
Rod
and
then insert the cut washers
as
shown
in
Figure
M52.
2.
Install the
Cam
Follower
Arm
so that the pin of
the
Cam
Follower
Arm
inserts into the groove of the
Main
Cam
Gear and also inserts into the slot
on
the
Main
Rod,
insert
the
retaining
ring.
Cam
Follower
Arm
I
Figure M52
1
, ,
4-4-7. ASSEMBLY PROCEDURES OF
LOADING
GEAR
(T)
,LOADING
GEAR
(S)
AND SECTOR GEAR
1 .
Set
the
P2
and
P3
posts to fully unloaded position, then
install the Loading Gear
(T)
and
(S)
so that the outer
hole
on
the Loading Gear
(T)
aligns with the outer hole
on the Loading Gear
(S)
as
shown
in
Figure
M53.
2.
Install the Sector Gear so that the outer hole
in
the
Sector Gear aligns with the projection mark on Loading
Gear
(T).
3.
Insert 3 retaining rings
as
shown
in
Figure
M54.
Sector
Gear
Loading Gear
(T)
Loading Gear
(S)
Figure
M53
Retaining~-~
T_/~Retaining
Ring
R1ngs
~.
1
Sector
Gear
Figure
M54
4-17
.....
z
w
::E
.....
en
::;)
..,
c
c(
..J
c(
(.)
z
c(
:I:
(.)
w
::E

Table of Contents

Related product manuals