EasyManua.ls Logo

Panasonic AG-7350 Series - Head Cleaning Pad Unit Maintenance; Mode Switch Maintenance Procedures; Procedures; Replacement of the Head Cleaning Pad

Panasonic AG-7350 Series
214 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-4-9.
HEAD
CLEANING
PAD
UNIT
MAINTENANCE
PROCEDURES
A. Replacement
of
the Head Cleaning Pad
1.
Remove a Cut Washer (
N)
and the Head
Cleaning Pad Unit.
2.
The Head Cleaning Pad Unit can
be
reinstalled
by
reversing
the
removal procedure.
Cut
Washer
(N)
Figure M
19
3-4-1
0.
MODE
SWITCH
MAINTENANCE
PROCEDURES
A. Replacement
of
the Mode Switch
1.
Place
the
deck
in
the
STOP mode.
2.
Remove the
Cassette
Compartment
Unit. (Refer
to
Disassembly Procedures)
3.
Remove
the
Pinch Cam Cap and Pressure
Roller Unit.
4.
Remove the Pinch Cam.
Pinch Cam Cap
Pressure
Roller Unit
Figure M20
5.
Unscrew 2 screws (P) and remove the Loading
Motor
Base.
6.
Unscrew a screw
(Q)
and unsolder 5
of
soldered
portions.
7.
Finally remove the Mode Switch.
Mode
Select
Switch
i
Screw
(P)
Figure
M21
Soldering
Portions
Figure M22
Loading
Motor
Base
8. Install a Mode Switch and tighten screw
(0),
then solder 5 soldering portions.
9.
Install
the
Pinch Cam and Pressure Roller Unit.
(Refer
to
" Assembly Procedures of Pinch Cam
& Pressure Roller
Unit.")
10.1nstall
the
Loading
Motor
Base and tighten
screw (P).
11.1nstall the
Cassette
Compartment.
(Refer
to
Reinstallation
of
Cassette
Compartment.)
3-9
w
0
z
<
z
w
t-
z
<i:
:E

Table of Contents

Related product manuals