Installer Manual 255/LOGIX 742-762-764 - Generalities
Ref. MKT-IM-021 / A - 20.02.2019 7 / 92
1.5. Abbreviations used
Assy................................................................................... Assembly
BLFC/Refill Flow Controller............................................. Brine Line Flow Controller
DF...................................................................................... Down Flow
DLFC ................................................................................. Drain Line Flow Controller
Inj ...................................................................................... Injector
PN ..................................................................................... Part Number
QC...................................................................................... Quick Connect
Regen ................................................................................ Regeneration
SBV.................................................................................... Safety Brine Valve
S. Steel.............................................................................. Stainless Steel
TC ...................................................................................... Time Clock
UF...................................................................................... Up Flow
1.6. Norms
1.6.1. Applicable norms
Comply with the following guidelines:
• 2006/42/EC: Machinery Directive;
• 2014/35/UE: Low Voltage Directive;
• 2014/30/UE: Electromagnetic compatibility;
• 2011/65/EC: Restriction of use of certain hazardous substances in electrical and electronic
equipment (RoHS);
• UNI EN ISO9001 (certificate no. 95.022 SSG ICS).
Meets the following technical standards:
• IEC/EN 60335-1;
• IEC 61010-1;
• EN 55014-1;
• EN 55014-2;
• EN 61000-3-2: 2006 + A1: 2009 + A2: 2009;
• EN 61000-3-3: 2008;
• EN 61000-6-2: 2005;
• EN 61000-6-3: 2007 + A1: 2011;
• EN 61326-1.
1.6.2. Available certificates
•CE;
•DM174;
•ACS.
Access to all certifications: