EasyManua.ls Logo

Perkins M115T - Page 22

Perkins M115T
86 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 3 TPD1317e
Page 18
Note: When tted, the bellows units should be in an unstrained condition so that the full bellows movement is
available to absorb expansion and engine movement.
Figure 8 - Dry Exhaust System Features - M92.
Bracket with link to allow for movement due to
expansion in the exhaust system (horizontal
exhaust systems should be suspended from the
deck head using similar brackets - rigid brackets
should not be used).
Insulating lagging
Rigid bracket to support the weight of the
vertical exhaust system
Flanges shown without
bolts for clarity
Heat blanket
90
O
Elbow
Connection
Heat blanket
Stainless steel belows

Other manuals for Perkins M115T

Related product manuals