EasyManua.ls Logo

Peterbilt 579 - Page 263

Peterbilt 579
414 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PREVENTIVE MAINTENANCE SCHEDULE
PREVENTIVE MAINTENANCE (PM) INTERVALS
SYSTEM COMPONENT MAINTENANCE TASK
Recommended PM
Interval
I A B
C
D E
Power
Steering
Steering intermediate shaft
U-joints (ON HIGHWAY)
Lubricate [EP NLGI #2 HD grease, +325° F to -10° F (+163° C
to -23° C) range].
X X
Steering intermediate
shaft
U-joints (OFF HIGHWAY or
CITY DELIVERY)
Lubricate [EP
NLGI #2 HD grease, +325° F to -10° F (+163° C
to -23° C) range].
X X
Draglink and
tie rod arm ball
sockets (ON HIGHWAY)
Lubricate (EP NLGI #2 lithium-based, moly-lled, HD grease).
X X
Draglink and
tie rod arm ball
sockets (OFF HIGHWAY or
CITY DELIVERY)
Lubricate (EP NLGI #2 lithium-based, moly-lled, HD grease).
X X
Fuel and
Tanks Fuel tanks
Inspect tanks, brackets, hoses, and ttings for correct location,
tightness, abrasion damage, and leaks; repair or replace as
required.
X
Fuel tank
breathers
Check for proper function; clean the drain hoses.
X
Fuel tank
straps
Check the strap tightness; tighten to proper torque value as
required:
Aluminum tank: 30 Lb. ft. (41 N.m.)
Cylindrical Steel tank: 8 Lb. ft. (11 N.m.)
X X
5
(04/13) Y53-6047–2C 5-27

Table of Contents

Related product manuals