4. Observe the total running time of the turbopump and if necessary, arrange for Pfeiffer Vac-
uum Service to replace the bearing.
5. Change the turbopump's operating fluid.
6. Install the turbopump according to these instructions (see chapter “Installation”, page 25).
7. Recommission the turbopump according to these instructions .
Decommissioning
54/74