EasyManua.ls Logo

Piper Lance II - Page 334

Piper Lance II
568 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LANCE
II
SERVICE
MANUAL
2.
Cut
the
eyelet
from
the
lead
and
remove
grommet.
3.
Grip
the
ferrule
of
the
lead
with
a pair
of
vise
grip
or
water
pump
pliers
and
with
a
twist-pull
action
remove
the
ferrule
from
the
cover
and
discard
ferrule.
Pull
lead
from
cover.
4.
Thread
pre-stripped
end
of
replacement
lead
through
cover.
NOTE
Replacement
leads
are
available
from
Bendix
in
lengths
of
17
thru
74
inches
in
3 inch
increments.
Use
nearest
next
longer
length
to
replace
defective
lead.
5.
Scrape
blue
coating
being
careful
not
to
cut
braid
for
.50
of
an
inch
from
end
of
lead.
6.
Push
back
braid
and
thread
a
new
ferrule
over
wire
and
under
braid
until
braid
just
covers
knurling.
(Refer
to
Figure
8-33.)
CAUTION
New
ferrules
must
be
used
and
inserted
under
the
braid
exactly
as
stated
in
Step
6.
7.
Pull
the
lead
back
into
the
cover
to
wedge
the
braid
between
the
tapers
of
the
cover
and
ferrule.
8.
Provide
a
back
up
support
for
the
cover
and
seat
the
ferrule
using
the
11-7074
Ferrule
Seating
Tool
(refer
to
Figure
8-34)
and
a
mallet.
Ferrule
must
be
driven
straight
into
the
cover
and
fully
seated.
9.
Thread
the
pre-stripped
end
of
conductor
through
grommet.
Place
a
new
eyelet
on
conductor
and
crimp
per
instructions
given
in
second
paragraph
of
Maintenance
of
Harness,
8-37.
f.
When
lead
being
replaced
is
of
the
elbow
type,
salvage
the
used
elbow
and
compression
springs
for
installation
on
replacement
lead.
Install
these
and
new
sleeve
and
contact
spring
(refer
to
Figures
8-35
and
8-36)
furnished
with
replacement
lead
per
instructions
given
in
Steps
a
thru
d.
g.
Reposition
clamps
and
brackets
and
replace
cable
ties
removed
earlier.
Clean
the
grommets,
sleeves
and
the
inside
of
the
cover
with
methylethylketone
or
denatured
alcohol.
h.
Spray
grommets
and
sleeves
with
Fluorocarbon
Spray,
such
as
MS-S-122,
supplied
by
Miller-Stephenson
Chemical
Co.
Inc.,
16
Sugar
Hollow
Road,
Danbury,
Connecticut
06810,
or
equivalent.
i.
Prior
to
seating
spark
plug
lead
terminal
in
plug
barrel
use
fluorocarbon
spray
on
spark
plug
terminal
insulating
sleeve
(refer
to
Figure
8-37)
to
prevent
heat
from
sticking
sleeve
to
spark
plug
barrel.
Lightly
lubricate
the
shoulder
of
ferrule
to
minimize
twisting
of
ferrule.
(Refer
to
Figure
8-38.)
Use
GO-JO
NO
LOK
manufactured
by
Goger
Inc.,
Akron,
Ohio
44309.
j.
Check
cam
securing
screw.
Screw
must
be
torqued
to
16-20
inch-pounds.
Issued:
1/3/78
POWER
PLANT
2B22

Table of Contents

Related product manuals