EasyManuals Logo

Precor SPINNER CHRONO POWER User Manual

Precor SPINNER CHRONO POWER
197 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #82 background imageLoading...
Page #82 background image
3. Disconnect the Data COMM, Strain Gauge, Battery, and Generator cables. Use a pen
or tape to mark the Data COM and Strain Gauge cables at the lower fork push mount
cable tie.
Note:Alternatively you can measure and record the Data COMM cable and Strain
Gauge cable lengths from the LPCA connectors to the right fork lower push-mount
cable tie. The reference marks (or measured cable lengths) will be used during the
installation process.
4. Remove the flywheel which requires removing the LPCA board, the cross member,
drive belt, and generator belt, see "Drive Belt, Generator Belt, and Flywheel Replace-
ment" on page85.
Contact Precor Customer Support at support@precor.com or 800.786.8404 with
any questions.
Page 74
5 Replacement Procedures
Data COMM Cable Replacement

Table of Contents

Other manuals for Precor SPINNER CHRONO POWER

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Precor SPINNER CHRONO POWER and is the answer not in the manual?

Precor SPINNER CHRONO POWER Specifications

General IconGeneral
BrandPrecor
ModelSPINNER CHRONO POWER
CategoryExercise Bike
LanguageEnglish

Related product manuals