ProMinent
®
Page 15
IMPORTANT
Check that the seal is located correctly. IP 65 is achieved only
when assembly has been carried out correctly.
(If necessary pull the front section forward in order to reduce
the stress on the seal.)
왘 Tighten the housing screws finger tight.
Fig. 6
Cl/ClO /O
3
2
-
+
4to20mA
shield
(gr) Pt1000 - /sig.gnd.
(wth) Pt1000 +
(bl) +U
---
(blk)-U
(br) meas.sig.
Pt100x -
Pt100x +
---
liquid pot.
r
ef.el.
glass el.
pH/OR
P
8
6
5
4
3
2
7
1
3465_3
1
2
3
4
4.2.2 Pipe mounting
See 4.2.1 Wall mounting
4.2.3 Panel mounting
NOTE
The cable must be laid in cable ducting on site to minimise
stresses.
Connect the cable from the back through the cut-out in the control panel:
왘 Follow the steps given in 4.2.4 Connecting coaxial cable and 4.2.5
Connecting terminals.
Assembly and installation
BA_DM_163_03_08_GB.p65 26.03.2008, 10:20 Uhr15