© 2021 Radiodetection Ltd 32
As a series of readings were taken on both pipelines
closer to the point of bonding, current appeared on both
pipelines and with the arrows in opposite direction. This
indicated that the bonding point was further ahead.
The point of bonding was located, and a measurement of
500mA, concluded that the other faults existed closer to
the rectifier.