EasyManua.ls Logo

Raven AutoBoom - Install the Ultraglide Wiring; Install the Autoboom Node; Connect the Harness to the Boom Function Controls - Newer Hydraulic Valves (Weatherpack Connectors); Wiring

Default Icon
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
Manual No. 016-0230-004 Rev. F 69
UltraGlide
Install the UltraGlide Wiring
Wiring Connections
For wiring connections made outside the cab, apply dielectric silicone grease (P/N 222-0000-006) generously
on both the male and female ends of the connectors. Application of the grease will prevent corrosion to the
pins and wires.
Install the AutoBoom Node
FIGURE 13. Node Mounting Location
1. Mount the AutoBoom node (P/N 063-0130-013) to the underside of the valve mounting plate using three
3/8”-16 UNC x 1-1/4” hex bolts (P/N 311-0054-106) and three 3/8”-16 zinc flanged lock nuts (P/N 312-1001-
164).
2. Insert the large, rectangular node connectors on the harness cable (P/N 115-0230-052) into the correct
ports of the AutoBoom node.
3. Tighten the bolts on the node connectors to secure the connections.
Connect the Harness to the Boom Function Controls - Newer
Hydraulic Valves (Weatherpack Connectors)
1. Locate the LEFT PRESS (PORT G1) and RIGHT PRESS (PORT G4) connectors on the harness cable
(P/N 115-0230-052).
2. Route the connectors to the AutoBoom valve (P/N 063-0131-124).
3. Connect the LEFT PRESS (PORT G1) connector to Port G1 on the AutoBoom valve.
4. Connect the RIGHT PRESS (PORT G4) connector to Port G4 on the AutoBoom valve.
CAUTION
Always connect the power cable as the last
step in the wiring process and verify that the
power leads are connected with the correct
polarity. Reversing power leads can cause
severe damage to the equipment.

Table of Contents

Other manuals for Raven AutoBoom

Related product manuals