EasyManua.ls Logo

Raven AutoBoom - Connect the Controller (if Applicable); Connect the Field Computer (if Applicable); Connect the Power Leads; Connecting the Field Computer

Default Icon
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 5
74 Miller Nitro 2000 Series AutoBoom™ Installation Manual
Connect the Controller (If Applicable)
1. Route the controller cable (P/N 115-0230-056) into the right side of the machine’s cab.
2. Connect the round 16-pin connector on the controller cable to the AutoBoom controller (P/N 063-0130-021).
Note: The AutoBoom controller should be mounted in the machine cab so that the machine operator has
easy access to it.
Connect the Field Computer (If Applicable)
Refer to the Installation & Operation Manual and the appropriate wiring schematic beginning on page 75 for
installation and wiring instructions for your specific field computer.
Connect the Power Leads
1. Locate the power and ground leads at the end of the controller cable (P/N 115-0230-056).
2. Disconnect the machine’s connectors from the battery terminals.
3. Install the BATTERY (POSITIVE) ring terminal on the positive battery terminal and reinstall the machine’s
battery connector.
4. Install the BATTERY (NEGATIVE) ring terminal on the negative battery terminal and reinstall the machine’s
battery connector.

Table of Contents

Other manuals for Raven AutoBoom

Related product manuals