31
OPERATION PLANNING
NOTE: Operation planning is only available on CR12.
Operation planning is a method to define guidance lines (including tram lines) and
headland application regions for an operation on a field. A operation plan can be
selected to use for any job in the a field that has an operation plan association. Also,
preconfigured guidance lines, headrows, and tramlines can be selected and applied
to numerous jobs within an existing field boundary.
Operation planning consists of two parts:
• Pre-planning allows the user to adjust field boundary and lines that are created
based on the boundary.
• Planning allows the user to create a plan for the field using the boundary modified
in pre-planning or existing guidance lines, add guidance lines, and application
zones.
To create a new operation plan:
1. Select Edit next to the desired field. A Field Management window will open.
2. Select Operations Planning.
NOTE: If needed, select Scouting to create a field boundary to use for
operations planning. A screen similar to the run screen will open but will
not apply product.
PRE-PLANNING
NOTE: Pre-planning must be selected.
1. Select the desired boundary.