EasyManua.ls Logo

Retsch PM100 - Inserting the Grinding Jar

Retsch PM100
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating the Device
30
5.8 Inserting the Grinding Jar
CAUTION
V0049
Ejected objects
Grinding jar not clamped
Grinding jars or clamping mechanisms can be ejected. This
results in a risk of injury.
Never leave loose clamping devices without clamped
grinding jars in the grinding jar support.
Before starting the machine, ensure that all grinding jars
are clamped.
Ensure that the red sleeve of the clamping mechanism is
clicked into place.
In the case of extended grinding processes, check that
the grinding jars are secure at the following intervals:
After 3 min, after 1h, after 5h then every 10-12h.
CAUTION
Scalding/burns
Hot grinding jar
Depending on the grinding process, the material being ground and
accordingly the grinding jar can become very hot.
Wear appropriate protection always when touching the grinding jar if
it is hot.
Never open hot grinding jars! Allow the grinding jars to cool down to
room temperature before opening.
NOTICE
H00681
Strong vibration and loud noise
Uneven load
The device can produce very high levels of vibrations and noise when
loading is uneven.
Always use 2 grinding jars opposite each other.
The grinding stations must be operated with the identical grinding
jars and with the same weight during each grinding process.
Switch the device off immediately if there are high levels of vibration
and noise, and check the number and gross weight of the jars.

Table of Contents

Other manuals for Retsch PM100

Related product manuals