1000-Sheet Finisher (B408) 
D017/D018/D019/D020 1-46  SM 
1.12.2   INSTALLATION  PROCEDURE 
 
  Unplug the main machine power cord before starting the following procedure. 
The following options must be installed before you install this finisher: 
  Bridge Unit (D368) 
  Paper Tray Unit (D331) or LCT (B391) 
 
1.  Unpack the finisher and remove the tapes. 
 
  Be sure to keep screw [A]. It will be needed to secure the grounding plate in 
step 4. 
 
2.  Install the front joint bracket [A] ( x 2; M4 x 17) and rear joint bracket [B] ( x 1; M4 x 
17). 
3.  Remove the left stand [C] ( x 3).