1. Install the main machine. * p.27
2. Install the roll feeder * p.47
-or-
Paper cassette. * p.64
3. Install the MFP options. * p.186
• Install the MFP options now before installing Folder FD6500A/B. It is much easier to access the
controller box SD card slots and board slots before the fan folder is installed.
• If the fan folder has already been installed, disconnect folder FD6500A/B and pull it away from the
main machine.
4. Folder FD6500A (B889), Bridge Unit BU6500 (D407)
1. Install the main machine. * p.27
2. Install the roll feeder * p.47
–or-
Paper cassette * p.64
3. Install the MFP options.
2. Installation
24