EasyManua.ls Logo

ROE EVISON HD102 - EVISION Hot Backup Implementation Steps; HD101 Hot Backup Steps; HD102 Hot Backup Steps

Default Icon
41 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EVISION - HD101 & HD102 www.roevisual.com
V1.13, 2020-05-20 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved.
27 / 41
6.13.1 HD101 Hot Backup Steps
A. Connect tiles to port1 from tile matrix’s beginning, keeping port2 disconnected;
B. Setup mapping for port1;
C. Save settings for port1;
D. Disconnect tiles from port1 and connect tiles to port2 from tile matrixs ending;
E. Setup mapping for port2;
F. Save settings for port2;
G. Reconnect tile to port1, keeping port2 also connected;
H. Hot backup established.
6.13.2 HD102 Hot Backup Steps
A. Connect tiles to port1 & port2;
B. Enable Backup Port option for port2;
C. Setup mapping for port 1 & port2;
D. Save settings for port1 & port2;
E. Hot backup established.
By enabling the Backup Port option, the specific port will be identified as a backup port. In the above case,
tiles will switch to port2 (backup port) when port1 (primary port) is down and switch back to port1
(primary) once it is back online.
If not enabled the option, tiles will stay port2 after switching, even port1 is back.

Table of Contents

Related product manuals