EasyManua.ls Logo

Sagem SAGEM-LINK F - Page 17

Sagem SAGEM-LINK F
142 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SAGEM-LINK F 288055571-04
Installation and Operation Manual
Page 17/142
Issue 04 : July 2005
Reproduction and communication prohibited without the written permission of Sagem Communication
Figure 1.9 : SAGEM-LINK F Grounding Kit
The number of necessary grounding points depends on the site, and on the cable length.
Normally, a good protection is achieved with :
A grounding kit on the cable close to the ODU
A grounding kit on the cable at the building entrance
A grounding kit on the cable at the bottom of the pylon
A grounding kit each 50 meters for long cables.

Table of Contents