LED R&D Lab(VD)
18
2. preparation of Cabinet installation
◆ Pre-prepare before installation
① Remove the tape of the upper BOX and open it. (Fig.2)
② Remove the top–cushion and PAD.
③ Check the configuration status of 3 sets. (REAR1, MODULE SET 3) (Fig. 3)
Fig.1 Packing
Fig. 2 Open the packing
※ Please be sure to comply with the dismantling order
(for the purpose of preventing conduction)
1. Pulling out the Module
2. Pulling out the REAR
Fig.3 Check the set
materials
MODULE
110”
PAD-EPE FRONT
TOP CUSHION
②
①