EasyManua.ls Logo

SANY SY75 - Month or 1,000 Hour; Annually or 2,000 Hour

SANY SY75
224 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Schedule SY75C Excavator OMM
5-16 Operation and Maintenance Manual — 0220 SANY
SAE/BHL Selector Switch - Set (See page 5-78.)
Collect engine oil sample. (See page 5-36.)
Collect hydraulic oil sample. (See page 5-55.)
Collect final drive oil sample (both). (See page 5-45.)
6 Month or 1,000 Hour
Accumulator Function - Check (See page 5-17.)
Fuel Tank Strainer - Check (See page 5-50.)
Hydraulic Pilot Line Filter Element - Replace (See page 5-63.)
Hydraulic Tank Return Filter - Replace (See page 5-65.)
Fuel Lines - Check (See page 5-49.)
Engine Exhaust Pipe Clamps - Check (See page 5-36.)
Annually or 2,000 Hour
Upper Structure and Lower Structure - Check (See page 5-89.)
Swing Bearing Bolts - Check (See page 5-81.)
Final Drive Oil - Change (See page 5-46.)
Hydraulic Oil - Change (See page 5-56.)
Engine Coolant - Change. (See page 5-32.)
At the completion of the maintenance tasks, record the completion of all maintenance tasks and fully activate the
machine and, if authorized, remove all lockout/tagout warnings and machine securing elements. Return the
machine to operation.

Table of Contents

Related product manuals