EasyManua.ls Logo

SANY SY75 - End-Of-Workday Checks

SANY SY75
224 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
End-of-Workday Checks SY75C Excavator OMM
4-28 Operation and Maintenance Manual — 0220 SANY
END-OF-WORKDAY CHECKS
1. Collect any trash or debris from the cab and deposit it into a trash can.
2. Remove all built-up mud or debris on the lower
structure and machine exterior.
3. Inspect the machine work equipment, machine exterior,
and lower structure for signs of fluid leaks or damage.
4. Near ocean (salt air) environments, thoroughly wash
away any salt residue, apply grease where rust is found
and perform maintenance on the electrical components
to prevent corrosion.
Fig. 4-65

Table of Contents

Related product manuals