EasyManua.ls Logo

SANY SY75 - Digging a Trench; Loading Operations

SANY SY75
224 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SY75C Excavator OMM Recommended Applications
SANY Operation and Maintenance Manual — 0220 4-27
TABLE OF
CONTENTS
INTRODUCTIONSAFETY
MACHINE
CONTROLS
MACHINE
OPERATION
MAINTENANCESPECIFICATIONS
OPTIONAL
EQUIPMENT
Digging a Trench
Trench work can be done efficiently by using a suitable
bucket and positioning the tracks parallel to the trench line.
When digging a wider trench, excavate the sides first then
remove the middle.
Loading Operations
It is more convenient to load material if the truck is loaded
from the rear than from the side.
Fig. 4-63
Fig. 4-64

Table of Contents

Related product manuals