Cooling system
Checking sacrificial anodes
1. Drain the sea water circuit as described in
Draining the sea water circuit
.
2. Check the sacrificial anodes and scrape off
all loose material from them.
3. Renew the sacrificial anode if less than half
of it is left. A new sacrificial anode is 60 mm
long with a diameter of 17 mm.
4. Renew the gasket when fitting.
If the sacrificial anodes are very corroded, the in-
spection intervals must be reduced.
Checking the sea water pump
impeller
1. Drain the sea water circuit as described in
Draining the sea water circuit
.
2. Check that the vanes of the impeller are not
heavily splintered or damaged.
325 163
Position of sacrificial anodes.
330 593
Sea water pump cover.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Scania DI13 series and is the answer not in the manual?

Scania DI13 series Specifications

General IconGeneral
Cooling SystemLiquid-cooled
Displacement12.7 liters
AspirationTurbocharged
AftertreatmentSCR (Selective Catalytic Reduction)
Engine TypeInline 6-cylinder
Fuel SystemCommon rail direct injection

Related product manuals