EasyManua.ls Logo

Schaerer Coffee Vito

Schaerer Coffee Vito
86 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.schaerer.com Installation and commissioning
BA SCV_EN
V05 | 04.2013
22
Information about the system filling
and heating-up phase:
The system is filled and heat-
ed up.
Touch "Continue".
The next commissioning
step appears.
"Continue" During the heating-up pha-
se the thermostat symbol
flashes.
The heating-up phase
takes ca. 5 minutes to re-
ach working temperature.
Filling the containers:
Fill with milk.
Connect/fill with milk.
Confirm by touching .
The next commissioning
step appears.
- Optionally various milk sy-
stems are possible.
See "Operation" - "Filling
and connecting" - "Milk"
Fill with choco powder.
Fill with choco powder
Confirm by touching .
The next commissioning
step appears.
- Optionally, various powder
systems are possible.
See "Operation" - "Filling
and connecting" - "Machine
powder"
Fill with espresso beans.
Pour the espresso beans into
the right-hand bean hopper.
Confirm by touching .
The next commissioning
step appears.
- The right-hand bean hop-
per is reserved for espres-
so.
Fill with coffee beans.
Pour the coffee beans into the
left-hand or middle bean hopper.
Confirm by touching .
The next commissioning
step appears.
- The left-hand or middle
bean hopper is reserved for
coffee beans.
Information about the second beve-
rage button level
- Optionally the buttons have
double assignments. The
possible button selection is
"top" or "bottom".
Selection of the beverage button le-
vel:
Change to 2nd level .
The level changes. The new
level is displayed.
"Top" level
"Bottom" level
See "Operation - Operating
options" to deactivate this
function.
Display/ display text Parameter description Setting range Notes

Table of Contents

Other manuals for Schaerer Coffee Vito

Related product manuals