EasyManua.ls Logo

Schindler 3300 - Page 242

Schindler 3300
269 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Schindler 3100/3300/6300 J 43402603 / 01 242/269
Copyright © 2017 INVENTIO AG
Landing Door
Miscellaneous
Landing Door
Specials
Landing Door Lock
Key of abbreviations:
M = month
Replacement to be done based on the condition.
Interval Pos. No Description
12 M
- Check for damages
12 M - Check for corrosion
12 M - Clean and dry mechanism
12 M 4 Clean main tracks, no oiling
12 M 1 Clean landing sills
12 M 1 Check sill gap
12 M 3 Check vertical parallelism of door panels
12 M 3 Check alignment of door panels
12 M - Check gaps between door panels and frames
12 M - Check gaps between door panels and door sill
12 M - Check if no tilt of panels
12 M - Check easy and smooth running of door panels
12 M 5 Check main rollers, counter rollers and retaining washers
12 M 2 Check guiding shoes
12 M 7 Check if the door re-closes automatically
Interval Pos. No Description
12 M
- Check adjustment of landing door interlock
12 M - Check door unlocking device
Interval Pos. No Description
12 M
6 Check of penetration of hook lock and lock engage
12 M 6 Check the unlocking device activity
12 M 6 Correct function and bearing play of lock roller and lock
bearing
12 M 6 Condition of contact bridge
12 M 6 Condition of safety contacts
12 M 6 Check lock roller
12 M 6 Check safety contact (KTS, KNET...)
12 M 6 Check contact bridge

Table of Contents

Related product manuals