34
5.2 Battery Calibration
Required tools: PC, USB cable, power supply box, dummy battery
1) Insert the dummy battery into the meter to be calibrated and connect the lead wire to the power
supply box
2) Set the power supply box to 2.4V.
3) In accordance with "5.1 Calibration mode start method", it starts in battery calibration mode.
4) Press the Measuring button. The display will display 3 times of measurement data, and average
value. and it will shift to 3V calibration
5) Set the power supply box to 3V.
6) Press the Measuring button. The display will display 3 times of measurement data, average value,
and a Gamma value. calibration is executed automatically.
7) Press the Power button (on/off switch) to turn the power supply off.