EasyManua.ls Logo

Sekonic LITEMASTER PRO - Removal of JR10-615 Sensor Fixing Pipe Assembly

Sekonic LITEMASTER PRO
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
the position of a figure.
*Chamfering of a screw hole comes upwards.
It lets Wire Harness / F pass in a hole
after fixing an Optics Cover / R
Assembly by a Rotating Stopper.
It lets a Wire Harness pass in a hole
(JR10-611). And a screw is tightened.
(ZA344 M1.7×4 1pcs, ZA348 M1.7×6 2pcs)
*ZA344 : The screw tightening torque is to
be 79cNm (6.98.8kgcm)
*ZA348 : The screw tightening torque is to
be 1014cNm (9.813.7kgcm)
It lets a JR101240 Wiring Protection Part (tube)
pass to Wire Harness (6pcs).
*Brown, red, and green1pcs
Black : 2pcs total : 6pcs
*After a Wiring Protection Part (tube) lets
Wire Harness pass, it is stuffed into the
hole which lets Wire Harness pass.
See the note at the time of assembly of each.
“3.1.3 Removal of JR10-901 (JR20-901) PCB / 1 Assembly ” “3.1.2 Removal of JR11-902
(JR21-902) PCB / 2 Assembly“ and ”3.1.1 Removal of JR10-122 Main Frame Cover / R Assembly“
3.1.7 Removal of JR10-615 Sensor Fixing Pipe Assembly
a) Since the Optics Main Frame Assembly (JR10-611) is pasted with the bond, when exchanging a
Sensor Fixing Pipe Assembly (JR10-615), please exchange the Sensor Fixing Pipe Assembly the
whole Optics Main Frame Assembly.
JR109007
Wire Harness / F
It lets Wire Harnes
s
pass in a hole.
ZA348(M1.7×6)
2pcs
ZA344(M1.7×4)
1pcs
It lets Wire Harness6pcs) pass to
a
JR101240 Wiring Protection Par
t
(tube).
The hole which let
s
Wire Harness pass.
A
Wiring Protection Par
t
(tube) is stuffed into th
e
hole which lets Wir
e
Harness pass.
The Sensor Fixing Pipe Assembl
y
(JR10-615) is being fixed with
adhesives.
A
n Optics Main Fram
e
A
ssembly (JR10-611) is
exchanged.
It lets Wire Harnes
s
(5) pass in a hole.

Related product manuals