EasyManua.ls Logo

Sekonic LITEMASTER PRO - Page 17

Sekonic LITEMASTER PRO
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
d) Remove the 3 screws securing the JR10-611 Optics Main Frame Assembly. (ZA344 M1.7×4 2pcs.
ZA348 M1.7×6 1pcs)
*ZA344 : The screw tightening torque is to be 79cNm (6.98.8kgcm)
*ZA348 : The screw tightening torque is to be 1014cNm (9.813.7kgcm)
e) Remove the 3 screws securing JR106110 Rotating Stopper. (ZA375 M1.4×5 3pcs.)
*ZA375 : The screw tightening torque is to be 79cNm (6.98.8kgcm)
*When removing an Optics Cover / R Assembly, it warns against losing a Wiring Protection Part
(tube).
Cautions during assembly
J After putting an Optics Cover / R Assembly(JR10-613),
it is a screw stop about a Rotating Stopper(JR106110).
(ZA375 M1.4×5 3pcs)
*ZA344 : The screw tightening torque is
to be 79cNm (6.98.8kgcm)
*
Dowels are inserted in 2 locations on
the Rotary Stopper .
*It checks that the position of a Rotating
Stopper's stopper portion has been to
ZA344(M1.7×4)
1pcs
ZA348(M1.7×6)
2pcs
JR10-611
Optics Main Frame Assembly
JR10-613
Optics Cover / R Assembly
It takes care about Wire Harness and removes an
Optics Main Frame Assembly (JR10-611).
JR10-613
O
p
tics Cover / R Assembl
y
JR106110
Rotatin
g
Sto
pp
e
r
ZA375(M1.4×5)
3
p
cs
JR101240
Wiring Protection Part
tub
e
Chamfering of a
screw hole
Stopper portion
Dowel 2 places

Related product manuals