EasyManua.ls Logo

SICK DUSTHUNTER SB30

SICK DUSTHUNTER SB30
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
24
OPERATING INSTRUCTIONS | DUSTHUNTER SB30
8014551/
1COY/3-0/2016-08| SICK
Subject to change without notice
3 ASSEMBLY AND INSTALLATION
3.2.2 Work to be performed
Measure the fitting location and mark the assembly location.
Leave enough clearance around the flange with tube to fit the sender/receiver unit.
Fig. 10: Clearance for sender/receiver unit (dimensions in mm)
Remove insulation (when fitted)
Cut suitable openings in the duct wall; bore large enough holes in brick or concrete
stacks (flange tube diameter (see “Flange with tube”, page 64)
)
Insert the flange with tube in the opening slanting slightly downwards (1 to 3°, see
“Fitt
ing the flange with tube”, page 23) so that the “Top” marking points upwards and
any condensate that may collect in the duct can drain off.
Weld the flange with tube on using an anchor plate for brick or concrete stacks, insert
junction plates for thin-walled ducts (see “Fitting the flange with tube”, page 23).
Close off the flange opening after fitting to prevent gas escaping.
300 300
500 300 200
Flange with tube
Clearance
Duct wall
NOTE:
Do not let separated pieces fall into the duct.
CAN-Bus

Table of Contents

Other manuals for SICK DUSTHUNTER SB30