OPERATING INSTRUCTIONS | DUSTHUNTER SB30
8014551/1COY/3-0/
2016-08| SICK
Subject to change without notice
ASSEMBLY AND INSTALLATION 3
Connect protective conductor to terminal.
Set motor circuit breakers according to the blower connection data (see Technical Data
f
or purge air unit) to a value 10% above the rated current.
Check the function and running direction of the blower (purge air flow direction must
match the arrows on the inlet and outlet openings on the blower). For wrong direction on
3-phase motors: Swap power connections L1 an
d L2.
Connect the pressure controller (option) to monitor purge air feed.
3.3.3.2 Installing the non-return valve option
Fig. 14: Installation of non-return valve
NOTE:
In case of doubt or when using a special motor version, the operating
instructions supplied with the motor have priority over any other informa-
tion.
NOTE:
Use a fail-safe power supply (standby unit, rails with redundant supply)
Fuse the purge air unit separate from the other system components. The
fus
e type must match the rated current (see technical details of purg
e air
un
it). Fuse each phase separately
.
Use c
ircuit breakers to prevent phase failures on one side.
Sender/receiver unit
Non-return valve
Purge air hose
Optional external purge air unit
CAN-Bus