Figure 6-103 Example of a Substation
The switching sequence C4 Off (Figure 6-104) should switch off feeder bay C4. The circuit breaker is opened;
followed by opening of one of the 2 busbar disconnectors.
[Scssc4as-110913-01, 1, en_US]
Figure 6-104 CFC Switching Sequence C4 Off
Control Functions
6.5 Switching Sequences
SIPROTEC 5, High-Voltage Bay Controller, Manual 429