Installing, exchanging and connecting modules
Network module (SAFEDLINK)
7
129 |
Building Technologies
Figure 64: Installation of both network modules (SAFEDLINK)
1 Network module (SAFEDLINK) on X13 (master module)
2 Fixing screws (2 pieces)
3 Mounting links on support plate
4 Nut for cable gland (2 per module)
1
5 Cable gland (2 per module)
1
6 Degraded mode network module (SAFEDLINK) on X12
7 Connector X1 on the rear of the network module
X3 Connection terminal C-WEB
X1
3
Plug-type connection for main module
X1
2
Plug-type connection for degraded mode module
1
When using shielded cables, the cable screw connections are needed to secure
the shielding.
When installing only one network module (
module is installed at the correct position on X13.
2
3
4
5
X3
X3
X13