35/73
Building Technologies Division Basic Documentation LME39… CC1P7106en
10 Inputs and outputs/internal connection diagram/program sequence of LME39.100... 08.12.2017
10.4 Application LME39.100... with LDU11...
Before startup of burner
In the case of plants without vent pipe to atmosphere
L
N
BV2
AL
T
12
SA
LP
EK2
K1
K2/1
K2/2
K3
K4
K5
BCI
H
Si
2
3
10
7
4
5
9 6
11
8
1
7106a10e/1011
LDU11...
HR
DW
Gas
tmosphäre
A1 B
E
Iar2 hr1
hr2
III V XI
GP
LDU LDU
GP
Figure 13: Application examples with LDU11...
Valve proving is started each time the system is switched on, with connection of
terminal 3, after controller ON or after lockout
If the LDU11... initiates lockout, valve proving can take up to 160 seconds.
Therefore, the maximum permissible response time of the air pressure switch is
180 seconds
With the LDU11…, faults during valve proving lead to lockout and, with the
LME39.100..., to lockout due to air pressure switch timeout (blink code 3)
Note!
A faulty air pressure switch (air pressure switch does not closing) leads to lockout
(blink code 3) on completion of the pressure switch response time of 180 seconds
and can be distinguished from lockout due to faulty valve proving only because the
LDU11... did not go to lockout
The fan motor must be connected to terminal 6 of the LDU11... since release takes
place via the air pressure switch upon successful valve proving