Siemens-Elema AB SPS-UD RX B7-120.033.01.10.02 MAMMOMAT 300
Solna, Sweden 05.98 65 02 186
3-6 Preparatory work
6 Insert sheet-metal strip (5) (additional radiation protection) and vibration absorbing
strip (6) into both stanchions.
7 Fit the lead-glass pane (4) into the groove of the stanchion and keep it in position
while mounting the other stanchion onto the generator.
8 Cover the holes with plastic caps (7).
MAM00086
3
74
6
5