Siemens-Elema AB SPS-UD RX B7-120.033.01.10.02 MAMMOMAT 300
Solna, Sweden 05.98 65 02 186
Cable connections 5-1
EMC measures
The following measures are required to ensure electromagnetic compatibility of the
equipment.
EMC measures at the cable entry
Fitting the hose clamps and ferrite sleeves
Figure 1 Cables from the stand
1 Lay the cable harness from the stand to the generator and leave approximately 3 cm
of the shielding at the U-bracket, see Figure 1.
If the cable harness is too long put away free cable length as ahown in Figure 2.
2 Fit on a hose clamp (3) on each cable.
Hose clamps are included in the delivery.
3 Fold the shield braid (1) backwards over the U-bracket (2) on each cable and clamp
with a hose clamp (3).
MAM00100
3cm