Siemens-Elema AB SPS-UD RX B7-120.033.01.10.02 MAMMOMAT 300
Solna, Sweden 05.98 65 02 186
Installation and Start-Up Instructions 0-1
Page
1 Prerequisites 1-1
Meters and appliances, tools, notes
Meters and appliances required 1-1
Tools required 1-1
Start-up, DHHS and X-ray decree area of application 1-2
Important notes on start-up 1-2
Checking and recording for the area of application of the
X-ray decree (§16 Germany) 1-2
Checking and recording for the DHHS area of application 1-3
Note on delivery state 1-4
2 Protective measures 2-1
Protective measures 2-1
3 Preparatory work 3-1
General 3-1
Scope of delivery 3-1
Unpacking the stand 3-2
Unpacking 3-2
Removing the transport safeguards 3-3
Removing the swivel-arm system transport safeguard 3-3
Transport safeguard for the lifting carriage 3-3
Transport safeguard for the rotary motion 3-4
Protective strips for the metal curtain 3-4
Unpacking the generator and mounting the radiation field 3-5
4 Installing the generator and the stand 4-1
Arranging the components 4-1
Removing the generator cover 4-2
Installing the cable ducts 4-3
Laying the cable harness 4-4
Aligning the stand 4-5
5 Cable connections 5-1
EMC measures 5-1
EMC measures at the cable entry 5-1
Fitting the hose clamps and ferrite sleeves 5-1
EMC measures on the bottom plate 5-3
Fitting the cables X1, X8 and X9 on the bottom plate 5-3
Connecting the stand cable-harness 5-4
The high-voltage connectors, alternative types 5-4
Connecting the high-voltage connector 5-5
Table of contents, Revision status