EasyManua.ls Logo

Siemens SIMATIC ET 200AL - Page 1175

Siemens SIMATIC ET 200AL
1585 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Functions
5.9 Standard machine projects
PROFINET with STEP 7 V15
228 Function Manual, 12/2017, A5E03444486-AH
In this case, you use the instruction "ReconfigIOSystem" to transfer a data record to the
PROFINET interface adding the optional IO device to the configuration.
Determined through parameter assignment: IO Device_2 is optional IO device
Configuration without the optional IO device
Configuration with the optional IO device
Figure 5-82 Example configuration with "Optional IO device" and the associated configuration options
Summary: The procedure in principle
The following phases are distinguished when it comes to the implementation of a standard
machine concept:
1. Engineering phase: Creating a standard machine project and loading into specific
machine or plant:
Completely configuring all IO devices (options) ever required in a specific machine or
plant
Configuring as optional those IO devices that will be omitted in specific machines or
plants
Configuring the interconnection of ports with respect to various arrangements of IO
devices
Preparing user program (see Configuring flexible order of IO devices (Page 236)) with
the possibility of selecting on-site the actually existing configuration via switch or HMI
device
2. Commissioning phase: Preparing specific machine or plant for operation:
Integrating machine or plant in the on-site network (see Adapt multiple use IO systems
locally (Page 224))
Selecting the currently existing configuration of the IO system via configured option

Table of Contents

Other manuals for Siemens SIMATIC ET 200AL

Related product manuals