Commissioning the device
5
5.1
General information on commissioning
NOTICE
Risk of damage to the device!
Make sufficient allowances for the device to warm up to room temperature before you put it
into use. If condensation develops, wait at least 12 hours before switching on the device.
Requirements for commissioning
The power supply is connected or the battery is fully charged.
5.2
Initial startup: Commissioning the operating system
Your device is delivered with preinstalled device drivers and SIEMENS software products.
After switching on the device for the first time, you can make the following menu-driven
personnel settings:
Specify display language and region
Create user account
Requirements
There is
no
data storage medium in the optical drive.
The default settings in the firmware/BIOS are unchanged before commissioning the
operating system.