Index
S7-300, CPU 31xC and CPU 31x: Installation
Operating Instructions, Edition 08/2004, A5E00105492-05
Index-5
Routing, 4-60
Routing an equipotential bonding conductor, A-14
RS 485
Bus connector, 4-38
Rules and regulations for error-free operation, A-1
S
S7 Distributed Safety, A-31
S7 F/FH Systems, A-31
S7-300
initial power on, 8-9
Safety class
Attainable, A-31
Scope of this documentation, v
Segment, 4-30
in the MPI subnet, 4-35
on the PROFIBUS subnet, 4-35
SF
LED, evaluation, 10-11
Shielding cables, A-12
Shielding contact element, 4-5
installing, 6-12
Terminating cables, 6-14
Shielding terminal, 6-12
Shielding terminals, 4-5
SIMATIC iMap, 4-50, 15
SIMATIC Manager, 8-18
start, 8-18
SIMOTION, 4-53
Slave diagnostics
installation, 10-27
Reading, example, 10-22
Slot, 4-47
Slot, 4-47
Slot number
Assigning, 5-9
Slot number label, 5-2
Slot numbers
Mounting, 5-10
SNMP, 10-8
SOFTNET PROFINET, 4-53
Startup
CPU 31x-2 DP in DP master mode, 8-39
CPU 31xC-2 DP in DP master mode, 8-39
Start-up
CPU 31x-2 DP as a DP master, 8-25
CPU 31x-2 DP as a DP slave, 8-28
CPU 31xC-2 DP as a DP master, 8-25
CPU 31xC-2 DP as a DP slave, 8-28
Station status, 10-28
Stepping mode, 10-2
Strain relief, 6-9
Stub cables
Length, 4-36
Subnet, 4-28
Subslot, 4-47
Substitute, 4-49
Synchronous error, 10-4
T
Terminating
Spring terminals, 6-7
Terminating resistor
MPI subnet, 4-42
Setting the bus connector, 6-16
Tools
required, 5-3
Transfer memory, 8-29
U
Ungrounded configuration
connecting a PG, 8-17
Update
Operating system, 9-3
V
Variables
Forcing, 10-2
Modifying, 10-2
Monitor, 10-2
Vendor ID, 10-29
W
WinLC, 4-53
Wiring
Accessories required, 6-1
Front connectors, 6-9
Front Connectors, 6-2
PS and CPU, 6-2, 6-5
Rules, 6-2
Tools and materials required, 6-1