Commissioning
8.3 Checklist prior to commissioning
SIMOTICS M-1FE2 built-in motors
170 Hardware Installation Manual, 04/2020, A5E50074509B AA
Checklist (5) - Cooling system checks
Has the cooling water supply been connected and is it ready for operation?
Example for the coolant circuit
1 Cooling unit
2 Flow rate indicator (optional)
3 Filter (optional)
4 Set the flow rate (optional)
5 Pump
6 Coolant container
7 Compressor/recooling unit
8 Coolant temperature measurement
Is the cooling water circulation (flow direction, flow rate, temperature) in compliance
with the specifications?
Is the seal between the spindle housing and the cooling jacket tight? No coolant may
escape from the drain holes.
❒