Commissioning
8.6 Commissioning the cooling circuit
SIMOTICS M-1FE2 built-in motors
Hardware Installation Manual, 04/2020, A5E50074509B AA
175
8.6 Commissioning the cooling circuit
Commission the cooling circuit before performing the electrical commissioning.
Precondition
You have flushed the cooling water pipes before connecting the motor and the converter
to the cooling circuit.
The cooling water pipes are properly connected.
Procedure
Open the cooling water feed.
Check all of the connections of the cooling water circuit for leaks.
Check whether the prescribed volume of coolant is guaranteed. Further information on
this can be found in Chapter "Cooling (Page 63)".