EasyManua.ls Logo

Siemens SINAMICS SM150 - Checking Hoisting Solenoids and Security Bolts; Checking the Cable and Screw Terminals; Checking the Isolating Clearances; Checking the Plug Connections

Siemens SINAMICS SM150
218 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9.4.3.2 Checking the isolating clearances
Slight, dry, non-conducting contamination is permitted.
Remove contamination caused by dust in conjunction with high humidity.
9.4.3.3 Checking hoisting solenoids and security bolts
Check the hoisting solenoids and security bolts at regular intervals.
Replace defective hoisting solenoids and security bolts before (re)commissioning.
9.4.3.4 Checking the plug connections.
Regularly check the plug connections to ensure they are seated correctly and the contacts are
not corroded.
Note
The fiber-optic cables for the gating boards must be properly inserted in the connectors.
9.4.3.5 Checking the cable and screw terminals
Check the cable and screw terminals regularly to ensure that they are secure.
Tighten the screws if necessary. When doing this, comply with the specified torques
(Page 170).
Check the cabling for defects.
Replace any defective parts immediately.
9.5 Maintenance
9.5.1 Fan maintenance
CAUTION
Temperature-controlled rotating fan
If the converter is equipped with a temperature-controlled fan, the fan can run on even if the
power section is switched off.
You can be injured if you touch the fan.
Wait until the fan has shut down.
Maintenance
9.5 Maintenance
SINAMICS SM150 6SL3845-7NN46-7AA0
Operating Instructions 04/2017 165

Table of Contents

Other manuals for Siemens SINAMICS SM150

Related product manuals