3.6.25 Capacitor Modules to increase the DC-link capacitance (option N08)...................................80
3.6.26 Controlled outgoing circuit for auxiliary equipment 400 V 3 AC (option N30).......................80
3.6.27 Sine-wave filter (option Y15)..................................................................................................80
4 Preparations for use...................................................................................................................................83
4.1 Requirements for installation location....................................................................................83
4.2 Inspections when receiving the delivery.................................................................................83
4.2.1 Checking the delivery.............................................................................................................83
4.2.2 Scope of delivery....................................................................................................................84
4.2.3 Checking shock and tilt indicators..........................................................................................84
4.2.4 Checking the load handling attachments...............................................................................85
4.3 Transportation........................................................................................................................86
4.3.1 Transport markings................................................................................................................86
4.3.2 Transport requirements..........................................................................................................86
4.3.3 Observe center of gravity.......................................................................................................87
4.3.4 Transport with a fork-lift truck.................................................................................................87
4.3.5 Transport with a crane...........................................................................................................88
4.3.6 Using lifting rods.....................................................................................................................88
4.3.7 Transporting transportation units packed in boxes................................................................90
4.4 Unpacking..............................................................................................................................91
4.4.1 Removing the packaging........................................................................................................91
4.4.2 Removing load securing devices...........................................................................................92
4.4.3 Lifting the cabinet off the transport pallet...............................................................................92
4.4.4 Opening doors in preparation for use.....................................................................................93
4.4.4.1 Opening doors in preparation for use.....................................................................................93
4.4.5 Checking the shock and tilt indicators inside the cabinet.......................................................94
4.5 Storage...................................................................................................................................94
4.5.1 Emptying the drive.................................................................................................................94
4.5.2 Storing a device.....................................................................................................................95
5 Installation..................................................................................................................................................97
5.1 Safety instructions for assembly............................................................................................97
5.2 Tools required........................................................................................................................98
5.3 Attaching side panels.............................................................................................................98
5.4 Screwing the transport units together....................................................................................99
5.5 Connecting to the foundation...............................................................................................100
5.6 Connecting cabinets.............................................................................................................101
5.7 Connecting the DC bus........................................................................................................102
5.8 Connecting the interface terminals.......................................................................................103
5.9 Connecting the water circuits...............................................................................................104
6 Electrical connection.................................................................................................................................107
6.1 Safety instructions for electrical connections.......................................................................107
6.2 Electromagnetic compatibility...............................................................................................109
6.3 Potential concept..................................................................................................................112
Table of contents
SINAMICS SM150 6SL3845-7NN46-7AA0
Operating Instructions 04/2017 7