Procedure
NOTICE
Damage caused by electrostatic charge
Note the information in chapter ESD Guidelines (Page 13).
Illustration similar
• Observe the coding of the plug and socket ① / ③.
• Lock the connector in the socket ②.
• Observe the cable routing:
– ① Cable routing to the right
– ③ Cable routing to the left
Result
You have installed the 3RW5 HMI High Feature in the 3RW55 or 3RW55 Failsafe soft starter and
can commission (Page 127) it.
4.4.3 Installing the High Feature 3RW5 HMI on a at surface
Requirements
• Note the mounting positions, minimum clearances and ambient conditions stated on the
data sheet.
• Removed 3RW5 HMI High Feature (Page 60)
• Level surface, e.g. suciently strong mounting plate
Mounting and dismantling
4.4 Installing, mounting and removing the 3RW5 HMI High Feature
SIRIUS 3RW55 and 3RW55 Failsafe Soft Starters
62 Equipment Manual, 02/2022, A5E35630887002A/RS-AF/006