Mobility, Intelligent Traffic Systems
Sopers Lane, Poole, Dorset, BH17 7ER
Security classification
Unrestricted
Page
9 of 154
Version
7
Status
Issued
Last Editor
manpreet.jeerh
Date
January 2020
Document Name
ST950 ICM Handbook
Document No.
667/HE/45950/000
7.3.11 Back-fill and In-fill the Stool .................................................................. 96
7.3.12 Sealing the Base .................................................................................. 96
7.3.13 Re-fit the Controller Electronics ............................................................ 97
7.4 Controller Commissioning .................................................................................... 97
7.4.1 Controller Setup ................................................................................... 97
7.4.2 RTC battery backup kit ......................................................................... 98
7.4.3 Loading IC4 Configuration .................................................................. 100
7.4.4 Loading Licences ............................................................................... 100
7.4.5 Network Connection ........................................................................... 105
7.4.6 Connection to Stratos ......................................................................... 105
7.4.7 Connection to Systems Other than Stratos ......................................... 107
7.4.8 Setting the Date and Time .................................................................. 108
7.4.9 Lamp Testing ..................................................................................... 110
7.4.10 Learning Lamp Loads ......................................................................... 110
7.4.11 Solar Cell Testing ............................................................................... 111
7.4.12 Junction System Testing .................................................................... 111
7.4.13 Lamp Supply Transformer .................................................................. 111
7.4.14 Site Information Export (PI dump) ...................................................... 111
7.4.15 Loading New Firmware ...................................................................... 112
7.5 Customer Acceptance ........................................................................................ 112
8 Leaving Site ................................................................................................................... 113
9 Routine Maintenance Procedures .................................................................................. 114
9.1 Routine Inspection of Signal Equipment ............................................................. 114
9.2 Routine Inspection and Electrical Testing of Controller ....................................... 114
9.3 Routine Setup Check ......................................................................................... 116
9.4 Other Maintenance Operations .......................................................................... 116
10 Fault Finding .................................................................................................................. 117
10.1 Site Visits ........................................................................................................... 117
10.1.1 On Receipt of a Fault Report .............................................................. 117
10.1.2 Before Going to a Site ........................................................................ 117
10.1.3 On Arrival at the Site .......................................................................... 117
10.2 Fault Finding Starting From the Fault Indications ............................................... 118
10.2.1 Cabinet Alarm Indicator ...................................................................... 118
10.2.2 Master Switch ..................................................................................... 118
10.2.3 Controller Switch ................................................................................ 118
10.2.4 Main CPU Card LEDs ........................................................................ 118
10.2.5 LSLS Card LEDs ................................................................................ 119
10.2.6 I/O card LEDs ..................................................................................... 119
10.2.7 Intelligent Backplane Controller .......................................................... 119
10.2.8 Audible Driver Module Single Output type ....................................... 119
10.2.9 Audible Driver Module Dual Output type .......................................... 120
10.2.10 Intermittent Faults/Problem Sites ........................................................ 121
10.2.11 Faults with Handset ............................................................................ 122
10.3 Replacement of Cards ........................................................................................ 122
10.3.1 Safety Requirements .......................................................................... 122
10.3.2 General Requirements ....................................................................... 122
10.3.3 Access to Cards in ST950 ELV 19” Controller Rack ........................... 122

Table of Contents