Page 3
EN
Assembly instructions table of contents
Assembly instructions table of contents
EC Declaration of Incorporation 6
Explanation of symbols and signs 7
Assembly instructions in accordance with
Machinery Directive 2006/42/EC, Annex VI 8
1. Safety instructions 9
1.1 Intended use 9
1.2 Authorized personnel 9
1.3 Electric shock hazard 10
1.4 System pressure hazard 10
1.5 Compressed air hazard 10
1.6 Hydraulic pressure hazard 11
1.7 Explosion protection information 11
2. Lubricants 12
2.1 General information 12
2.2 Selection of lubricants 12
2.3 Approved lubricants 13
3. Overview 15
4. Assembly 16
4.1 General information 16
4.2 Setup and attachment 16
4.2.1 Assembly holes 18
4.2.2 Mounting dimensions 18
4.3 Pump elements 19
4.3.2 KFGC (CAN bus) pump elements 19
4.3.3 Installing a pump element 19
4.3.4 Deliverable pump elements 20
4.3.5 Pressure regulating valve 21
4.4.2 Filler coupling 23
4.4.3 Filling cylinder 23
4.4.4 Filling cover 23
4.5 Electrical connection 24
4.5.1 General conditions for electrical
connections 24
4.5.2 KFG series 25
4.5.2.1 Power supply 12-/24 VDC 25
4.5.2.2 External control 25
4.5.2.3 Fill level monitoring 26
4.5.3 KFGS series 29
4.5.3.1 Power supply 12-/24 VDC 29
4.5.3.2 Connectivity for counter operation
without system monitoring 30
4.5.3.3 Connectivity for counter operation
without system monitoring 31
4.5.3.4 Connectivity for counter operation
with system monitoring 31
4.5.3.5 Connectivity for timer operation
without system monitoring 32
4.5.3.6 Connectivity for timer operation
with system monitoring 32
4.5.4 KFGC series 33
4.5.4.1 Power supply 12-/24 VDC 33
4.5.4.2 Connectivity 35
4.5.4.3 Example of CAN bus control
with 5/4 directional solenoid valve 37
connection to CAN bus system 37
Systems without connection to
CAN busystem 37
4.7 Lubrication line connection 38
4.8 Lubrication line arrangement 38
4.9 Progressive system ventilation 39
4.10 Note on the rating plate 39