EasyManua.ls Logo

Skydio X2 - Page 67

Skydio X2
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
63
Skydio X2 Color/Thermal - Operator Manual © 2022 Skydio, Inc. All rights reserved.
place the new hard stop in the socket - the larger
diameter pin should be inserted into the drone,
and the smaller diameter pin should face outward
line up the hole in the hard stop flange with the
hole in the drone and insert the screw
tighten until the hard stop is secure
Step 3 - Install the new hard stop(s)
Maintenance
Replace hard stops
NOTE: The torque value should be approximately 6 cNm.

Related product manuals